CSL’s M/V Nukumi Named Bulk Ship of the Year 2022
Presented to a bulk ship or newly built vessel, the award recognizes the many innovations built into the design of M/V Nukumi to enhance safety, efficiency and performance, and to reduce the vessel’s overall environmental footprint.
The cutting-edge 26,000 DWT M/V Nukumi is the first diesel-electric Laker and the first single point loader to operate in Canada. The ship features a unique hull design, quieter machinery, a single point of loading system and a shuttle boom.

Corps of Engineers Begins Muskegon Harbor Revetment Repair Work
The U.S. Army Corps of Engineers, Detroit District is beginning long-term improvements to the Muskegon Harbor North Revetment to improve the safety and stability of the popular walkway. The $5.765... Read More

M/V Cuyahoga to be Dismantled after Being Damage in 2024 Fire
The M/V Cuyahoga is being dismantled after the vessel was irreparably damaged in a fire last year. The classic World War II-era laker made her final voyage across Lake Erie... Read More